| |
Early Life Cycle
|
|
| |
Up to the completion of the system requirements definition....
|
|
| |
Source: ( ISBSG-Release 6 1999 ) |
|
| |
|
|
| |
Earned Value (EV)
|
|
| |
(1) A method for measuring project performance. It compares the amount of work that was planned with what was actually a...
|
|
| |
Source: ( PMI:PMBOK ) |
|
| |
|
|
| |
Effective Process
|
|
| |
A process that can be characterized as practiced, documented, enforced, trained, measured, and able to improve. (See als...
|
|
| |
Source: ( SEI:SW-CMM ) |
|
| |
|
|
| |
Effectiveness Analysis
|
|
| |
An analytical approach used to determine how well a system performs in its intended utilization environment. [MIL-STD 49...
|
|
| |
Source: ( SEI:SE-CMM ) |
|
| |
|
|
| |
Efficiency
|
|
| |
The degree to which a system or component performs its designated functions with minimum consumption of resources. [IEEE...
|
|
| |
Source: ( SEI:SE-CMM ) |
|
| |
|
|
| |
Effort
|
|
| |
The number of labor units required to complete an activity or other project element. Usually expressed as staffhours, st...
|
|
| |
Source: ( PMI:PMBOK ) |
|
| |
|
|
| |
Elementary Process
|
|
| |
An elementary process is the smallest unit of activity that is meaningful to the user(s)....
|
|
| |
Source: ( IFPUG CPM 4.1 ) |
|
| |
|
|
| |
End User
|
|
| |
The individual or group who will use the system for its intended operational use when it is deployed in its environment....
|
|
| |
Source: ( SEI:SW-CMM ) |
|
| |
|
|
| |
End-user efficiency GSC
|
|
| |
One of the 14 general system characteristics describing the degree of consideration for human factors and ease of use fo...
|
|
| |
Source: ( IFPUG CPM 4.1 ) |
|
| |
|
|
| |
Engineering Change
|
|
| |
In configuration management, an alteration in the configuration of a configuration item or other designated item after f...
|
|
| |
Source: ( SEI:SE-CMM ) |
|
| |
|
|
| |
Engineering Group
|
|
| |
A collection of individuals (both managers and technical staff) representing an engineering discipline. Examples of engi...
|
|
| |
Source: ( SEI:SW-CMM ) |
|
| |
|
|
| |
Engineering Requirements
|
|
| |
A translation of the set of essential customer needs into engineering language, specific to the domain expertise of the ...
|
|
| |
Source: ( SEI:SE-CMM ) |
|
| |
|
|
| |
Enhancement
|
|
| |
The modification of an existing application....
|
|
| |
Source: ( IFPUG CPM 4.1 ) |
|
| |
|
|
| |
Enhancement Project
|
|
| |
Changes made to an existing application where new functionality has been added, or existing functionality has been chang...
|
|
| |
Source: ( ISBSG-Release 6 1999 ) |
|
| |
|
|
| |
Enhancement Project
|
|
| |
Set of activities which 'add', ‘change’ or ‘delete’ functions within one or more existing applications, they are usually...
|
|
| |
Source: ( Total Metrics - Function Point Consultants ) |
|
| |
|
|
| |
Enhancement project function point count (EFP).
|
|
| |
A count that measures the modifications to the existing application that add, change, or delete user functions delivered...
|
|
| |
Source: ( IFPUG CPM 4.1 ) |
|
| |
|
|
| |
Enterprise
|
|
| |
A unit within a company or spanning several companies within which many projects are managed as a whole. All projects wi...
|
|
| |
Source: ( SEI:SE-CMM ) |
|
| |
|
|
| |
Entity (or entity type)
|
|
| |
A fundamental thing of relevance to the user, about which a collection of facts is kept. An association between entities...
|
|
| |
Source: ( IFPUG CPM 4.1 ) |
|
| |
|
|
| |
Entity Subtype
|
|
| |
A subdivision of an entity type. A subtype inherits all the attributes and relationships of its parent entity type, and ...
|
|
| |
Source: ( IFPUG CPM 4.1 ) |
|
| |
|
|
| |
Entry (-type)
|
|
| |
A movement of the data attributes found in one data group from the user’s side of the software boundary to the inside of...
|
|
| |
Source: ( COSMIC-FFP MM Version 2.1 ) |
|
| |
|
|
| |
Environment
|
|
| |
The circumstances or conditions that will surround the system when it is in use. Examples include the natural environmen...
|
|
| |
Source: ( SEI:SE-CMM ) |
|
| |
|
|
| |
Estimate
|
|
| |
An assessment of the likely quantitative result. Usually applied to project costs and durations and should always includ...
|
|
| |
Source: ( PMI:PMBOK ) |
|
| |
|
|
| |
Evaluation
|
|
| |
The use of reviews, inspections, and/or tests, to determine that a software product or service satisfies specified requi...
|
|
| |
Source: ( SEI:SA-CMM ) |
|
| |
|
|
| |
Event (-type)
|
|
| |
see "Triggering event"...
|
|
| |
Source: ( COSMIC-FFP MM Version 2.1 ) |
|
| |
|
|
| |
Exit (-type)
|
|
| |
A movement of the data attributes found in one data group from inside the software boundary to the user side of the soft...
|
|
| |
Source: ( COSMIC-FFP MM Version 2.1 ) |
|
| |
|
|
| |
External input (EI)
|
|
| |
An external input (EI) is an elementary process that processes data or control information that comes from outside the a...
|
|
| |
Source: ( IFPUG CPM 4.1 ) |
|
| |
|
|
| |
External inquiry (EQ)
|
|
| |
An external inquiry (EQ) is an elementary process that sends data or control information outside the application boundar...
|
|
| |
Source: ( IFPUG CPM 4.1 ) |
|
| |
|
|
| |
External interface file (EIF)
|
|
| |
An external interface file (EIF) is a user identifiable group of logically related data or control information reference...
|
|
| |
Source: ( IFPUG CPM 4.1 ) |
|
| |
|
|
| |
External output (EO)
|
|
| |
An external output (EO) is an elementary process that sends data or control information outside the application’s bounda...
|
|
| |
Source: ( IFPUG CPM 4.1 ) |
|
| |
|
|
| |
External System (interfaces)
|
|
| |
The system or product interfaces to other systems, communication networks, power supplies, resource connectors, etc., th...
|
|
| |
Source: ( SEI:SE-CMM ) |
|
| |
|
|