Scenario Name
|
|
| |
Used to uniquely identify a particular count within a phase for a project or for an application. Eg. There may be severa...
|
|
| |
Source: ( Total Metrics - Function Point Consultants ) |
|
| |
|
|
| |
Schedule Control
|
|
| |
Controlling changes to the project schedule....
|
|
| |
Source: ( PMI:PMBOK ) |
|
| |
|
|
| |
Schedule Development
|
|
| |
Analyzing activity sequences, activity durations, and resource requirements to create the project schedule....
|
|
| |
Source: ( PMI:PMBOK ) |
|
| |
|
|
| |
Schedule Performance Index (SPI)
|
|
| |
The ratio of work performed to work scheduled (BCWP/BCWS). See earned value....
|
|
| |
Source: ( PMI:PMBOK ) |
|
| |
|
|
| |
Schedule Variance (SV)
|
|
| |
(1) Any difference between the scheduled completion of an activity and the actual completion of that activity. (2) In ea...
|
|
| |
Source: ( PMI:PMBOK ) |
|
| |
|
|
| |
Scheduled Finish Date (SF)
|
|
| |
The point in time work was scheduled to finish on an activity. The scheduled finish date is normally within the range of...
|
|
| |
Source: ( PMI:PMBOK ) |
|
| |
|
|
| |
Scheduled Start Date (SS)
|
|
| |
The point in time work was scheduled to start on an activity. The scheduled start date is normally within the range of d...
|
|
| |
Source: ( PMI:PMBOK ) |
|
| |
|
|
| |
Scope
|
|
| |
The sum of the products and services to be provided as a project....
|
|
| |
Source: ( PMI:PMBOK ) |
|
| |
|
|
| |
Scope Baseline
|
|
| |
See baseline....
|
|
| |
Source: ( PMI:PMBOK ) |
|
| |
|
|
| |
Scope Change
|
|
| |
Any change to the project scope. A scope change almost always requires an adjustment to the project cost or schedule....
|
|
| |
Source: ( PMI:PMBOK ) |
|
| |
|
|
| |
Scope Change Control
|
|
| |
Controlling changes to project scope....
|
|
| |
Source: ( PMI:PMBOK ) |
|
| |
|
|
| |
Scope Creep/Gallop
|
|
| |
Additional functionality that was not specified in the original requirements, but is identified as the scope is being cl...
|
|
| |
Source: ( IFPUG CPM 4.1 ) |
|
| |
|
|
| |
Scope Definition
|
|
| |
Decomposing the major deliverables into smaller, more manageable components to provide better control....
|
|
| |
Source: ( PMI:PMBOK ) |
|
| |
|
|
| |
Scope of the FSM
|
|
| |
The set of Functional User Requirements to be included in a specific FSM instance....
|
|
| |
Source: ( ISO/IEC JTC1/SC7:14143-1 ) |
|
| |
|
|
| |
Scope Planning
|
|
| |
Developing a written scope statement that includes the project justification, the major deliverables, and the project ob...
|
|
| |
Source: ( PMI:PMBOK ) |
|
| |
|
|
| |
Scope Verification
|
|
| |
Ensuring that all identified project deliverables have been completed satisfactorily....
|
|
| |
Source: ( PMI:PMBOK ) |
|
| |
|
|
| |
S-Curve
|
|
| |
Graphic display of cumulative costs, labor hours, or other quantities, plotted against time. The name derives from the S...
|
|
| |
Source: ( PMI:PMBOK ) |
|
| |
|
|
| |
Senior Manager
|
|
| |
A management role at a high enough level in an organization that the primary focus is the long-term vitality of the orga...
|
|
| |
Source: ( SEI:SW-CMM ) |
|
| |
|
|
| |
Sensitivity Analysis
|
|
| |
A technique for discovering the behavior of a system by changing one input at a time by a small amount and determining t...
|
|
| |
Source: ( SEI:SE-CMM ) |
|
| |
|
|
| |
Service Level Agreement
|
|
| |
A written agreement between a service provider and Customer(s) that documents agreed service levels for a service....
|
|
| |
Source: ( ITIL Sept 2002 ) |
|
| |
|
|
| |
Should-Cost Estimates
|
|
| |
An estimate of the cost of a product or service used to provide an assessment of the reasonableness of a prospective con...
|
|
| |
Source: ( PMI:PMBOK ) |
|
| |
|
|
| |
Software
|
|
| |
An organized set of instructions, data, and interrelationships which when loaded into the program execution area of a co...
|
|
| |
Source: ( IEEE SESC:729 ) |
|
| |
|
|
| |
Software Acquisition Management Personnel
|
|
| |
Those individuals who are trained, educated, or experienced in software acquisition management and who are either assign...
|
|
| |
Source: ( SEI:SA-CMM ) |
|
| |
|
|
| |
Software Acquisition Plans
|
|
| |
The collection of plans, both formal and informal, used to express how software acquisition activities will be performed...
|
|
| |
Source: ( SEI:SA-CMM ) |
|
| |
|
|
| |
Software Acquisition Process
|
|
| |
A set of activities, methods, practices, and transformations that people use to acquire software and the associated prod...
|
|
| |
Source: ( SEI:SA-CMM ) |
|
| |
|
|
| |
Software Acquisition Process Assets
|
|
| |
A collection of entities, maintained by an organization, for use by projects in developing, tailoring, maintaining, and ...
|
|
| |
Source: ( SEI:SA-CMM ) |
|
| |
|
|
| |
Software Acquisition Project
|
|
| |
An undertaking that is focused on acquiring the software components and associated documentation of a system. A software...
|
|
| |
Source: ( SEI:SA-CMM ) |
|
| |
|
|
| |
Software Baseline Audit
|
|
| |
An examination of the structure, contents, and facilities of the software baseline library to verify that baselines conf...
|
|
| |
Source: ( SEI:SW-CMM ) |
|
| |
|
|
| |
Software Capability Evaluation
|
|
| |
(1) An appraisal by a trained team of professionals, using a method such as the SEI software capability evaluation metho...
|
|
| |
Source: ( SEI:SE-CMM ) |
|
| |
|
|
| |
Software Configuration Item (SCI)
|
|
| |
As "configuration item" in ISO 10007 excluding hardware and services, recursively to identify individual software items ...
|
|
| |
Source: ( SC7/WG8:15846 ) |
|
| |
|
|
| |
Software Configuration Management (SCM)
|
|
| |
The process of applying Configuration Management (see ISO 10007) throughout the software life cycle to ensure the comple...
|
|
| |
Source: ( SC7/WG8:15846 ) |
|
| |
|
|
| |
Software Development Plan
|
|
| |
The collection of plans that describe the activities to be performed for the software project. It governs the management...
|
|
| |
Source: ( SEI:SE-CMM ) |
|
| |
|
|
| |
Software Engineering Environment (SEE)
|
|
| |
The set of automated tools, firmware devices, and hardware necessary to perform the software engineering effort. The aut...
|
|
| |
Source: ( ISO/IEC JTC1/SC7:14764 ) |
|
| |
|
|
| |
Software Engineering Group
|
|
| |
The collection of individuals (both managers and technical staff) who have responsibility for software development and m...
|
|
| |
Source: ( SEI:SA-CMM ) |
|
| |
|
|
| |
Software Engineering Institute (SEI) Maturity
|
|
| |
The ability of an organization to achieve a controlled and measured process as the foundation for continued improvement ...
|
|
| |
Source: ( IFPUG CPM 4.1 ) |
|
| |
|
|
| |
Software Engineering Personnel
|
|
| |
Those individuals who are trained, educated, or experienced in software engineering and who are either assigned to or su...
|
|
| |
Source: ( SEI:SA-CMM ) |
|
| |
|
|
| |
Software Engineering Process Group
|
|
| |
A group of specialists who facilitate the definition, maintenance, and improvement of the software process used by the o...
|
|
| |
Source: ( SEI:SW-CMM ) |
|
| |
|
|
| |
Software Engineering Staff
|
|
| |
The software technical people (e.g., analysts, programmers, and engineers), including software task leaders, who perform...
|
|
| |
Source: ( SEI:SW-CMM ) |
|
| |
|
|
| |
Software Integration
|
|
| |
A process of putting together selected software components to provide the set or specified subset of the capabilities th...
|
|
| |
Source: ( SEI:SW-CMM ) |
|
| |
|
|
| |
Software Life Cycle
|
|
| |
The period of time that begins when a software product is conceived and ends when the software is no longer available fo...
|
|
| |
Source: ( SEI:SA-CMM ) |
|
| |
|
|
| |
Software Manager
|
|
| |
Any manager, at a project or organizational level, who has direct responsibility for software development and/or mainten...
|
|
| |
Source: ( SEI:SW-CMM ) |
|
| |
|
|
| |
Software Measurement
|
|
| |
The quantification of the software production process and its product in order to supply meaningful and timely managemen...
|
|
| |
Source: ( Total Metrics - Function Point Consultants ) |
|
| |
|
|
| |
Software Metrics
|
|
| |
The resulting values obtained from the Software Measurement process, which indicate the performance efficiency, cost eff...
|
|
| |
Source: ( Total Metrics - Function Point Consultants ) |
|
| |
|
|
| |
Software Plans
|
|
| |
The collection of plans, both formal and informal, used to express how software development and/or maintenance activitie...
|
|
| |
Source: ( SEI:SW-CMM ) |
|
| |
|
|
| |
Software Process
|
|
| |
The process or set of processes used by an organization or project to plan, manage, execute, monitor, control and improv...
|
|
| |
Source: ( ISO/IEC JTC1/SC7:15504-9 ) |
|
| |
|
|
| |
Software Process Improvement Plan
|
|
| |
A plan, derived from the recommendations of a software process assessment, that identifies the specific actions that wil...
|
|
| |
Source: ( SEI:SW-CMM ) |
|
| |
|
|
| |
Software Process Maturity
|
|
| |
The extent to which a specific process is explicitly defined, managed, measured, controlled, and effective. Maturity imp...
|
|
| |
Source: ( SEI:SW-CMM ) |
|
| |
|
|
| |
Software Product
|
|
| |
The complete set, or any of the individual items of the set, of computer programs, procedures, and associated documentat...
|
|
| |
Source: ( SEI:SW-CMM ) |
|
| |
|
|
| |
Software Project
|
|
| |
An undertaking requiring concerted effort, which is focused on analyzing, specifying, designing, developing, testing, an...
|
|
| |
Source: ( SEI:SW-CMM ) |
|
| |
|
|
| |
Software Project Life Cycle
|
|
| |
Model of a software project beginning with the decision to develop, operate and/or maintain a software product and endin...
|
|
| |
Source: ( SC7/WG8:16326 ) |
|
| |
|
|
| |
Software Project Management (SPM)
|
|
| |
Procedures, practices, technologies and knowledge (skill, background and wisdom to apply knowledge effectively in practi...
|
|
| |
Source: ( SC7/WG8:16326 ) |
|
| |
|
|
| |
software project management (SPM) plan
|
|
| |
A plan of plans to manage the execution of the appropriate software life cycle processes, resources and products....
|
|
| |
Source: ( SC7/WG8:16326 ) |
|
| |
|
|
| |
Software Project Management (SPM) Team
|
|
| |
An aggregate of personnel assigned management responsibilities for a software project. SPM team members have individual/...
|
|
| |
Source: ( SC7/WG8:16326 ) |
|
| |
|
|
| |
Software Project Manager (PM)
|
|
| |
Individual with final responsibility for a software product throughout the entire software project life cycle (i.e., con...
|
|
| |
Source: ( SC7/WG8:16326 ) |
|
| |
|
|
| |
Software Quality Assurance
|
|
| |
(1) A planned and systematic pattern of all actions necessary to provide adequate confidence that a software work produc...
|
|
| |
Source: ( SEI:SA-CMM ) |
|
| |
|
|
| |
Software Quality Goal
|
|
| |
Quantitative quality objectives defined for a software work product....
|
|
| |
Source: ( SEI:SW-CMM ) |
|
| |
|
|
| |
Software Quality Management
|
|
| |
The process of defining quality goals for a software product, establishing plans to achieve these goals, and monitoring ...
|
|
| |
Source: ( SEI:SW-CMM ) |
|
| |
|
|
| |
Software Requirement
|
|
| |
A condition or capability that must be met by software needed by a user to solve a problem or achieve an objective. [IEE...
|
|
| |
Source: ( SEI:SW-CMM ) |
|
| |
|
|
| |
Software Work Product
|
|
| |
Any artifact created as part of defining, maintaining, or using a software process, including process descriptions, plan...
|
|
| |
Source: ( SEI:SW-CMM ) |
|
| |
|
|
| |
Source Selection
|
|
| |
Choosing from among potential contractors....
|
|
| |
Source: ( PMI:PMBOK ) |
|
| |
|
|
| |
Specification
|
|
| |
A document prepared to support acquisition and life-cycle management that clearly and accurately describes essential tec...
|
|
| |
Source: ( SEI:SE-CMM ) |
|
| |
|
|
| |
Speed of Delivery
|
|
| |
Measures the ability of a team to deliver a quantity of software over a period of time. It is defined as the Functional ...
|
|
| |
Source: ( ISBSG-Release 6 1999 ) |
|
| |
|
|
| |
Staff
|
|
| |
The people, including task leaders, who are not managers and who are responsible for accomplishing the assigned business...
|
|
| |
Source: ( SEI:SE-CMM ) |
|
| |
|
|
| |
Staff Acquisition
|
|
| |
Getting the human resources needed assigned to and working on the project....
|
|
| |
Source: ( PMI:PMBOK ) |
|
| |
|
|
| |
Stage
|
|
| |
A partition of the software effort that is of a manageable size and that represents a meaningful and measurable set of r...
|
|
| |
Source: ( SEI:SW-CMM ) |
|
| |
|
|
| |
Stakeholder
|
|
| |
Individuals and organizations who are involved in or may be affected by project activities....
|
|
| |
Source: ( PMI:PMBOK ) |
|
| |
|
|
| |
Standard Development Environment
|
|
| |
A set of guidelines describing a standard process lifecycle for the development of software within an organisation....
|
|
| |
Source: ( Total Metrics - Function Point Consultants ) |
|
| |
|
|
| |
Standard Process
|
|
| |
The operational definition of the basic process that guides the establishment of a common process in an organization. It...
|
|
| |
Source: ( SEI:SE-CMM ) |
|
| |
|
|
| |
Start Date
|
|
| |
A point in time associated with an activity’s start, usually qualified by one of the following: actual, planned, estimat...
|
|
| |
Source: ( PMI:PMBOK ) |
|
| |
|
|
| |
Statement of Work (SOW)
|
|
| |
A narrative description of products or services to be supplied under contract...
|
|
| |
Source: ( PMI:PMBOK ) |
|
| |
|
|
| |
Strategic Vision
|
|
| |
The political, economic, and psychological forces of an organization that ensure the maximum support for the adopted mar...
|
|
| |
Source: ( SEI:SE-CMM ) |
|
| |
|
|
| |
Suppliers
|
|
| |
The development, manufacturing, verification, and deployment personnel that define, design, code, fabricate, assemble, i...
|
|
| |
Source: ( SEI:SA-CMM ) |
|
| |
|
|
| |
Support Function
|
|
| |
The tasks, actions, and activities to be performed and the system elements required to provide operations, maintenance, ...
|
|
| |
Source: ( SEI:SA-CMM ) |
|
| |
|
|
| |
System
|
|
| |
Is used synonymously for ‘software application’. It is assumed that an organisation will develop and maintain one or mor...
|
|
| |
Source: ( Total Metrics - Function Point Consultants ) |
|
| |
|
|
| |
Systems Analysis
|
|
| |
A systematic investigation of a real or planned system to determine the information requirements and processes of the sy...
|
|
| |
Source: ( ISO/IEC JTC1/SC1:2382-20 ) |
|
| |
|
|
| |
System Architecture
|
|
| |
The composite of the functional, physical, and foundation architectures, which form the basis for establishing a system ...
|
|
| |
Source: ( SEI:SA-CMM ) |
|
| |
|
|
| |
System Design
|
|
| |
The product of the development process which provides sufficient details, drawings, or other pertinent information, on t...
|
|
| |
Source: ( SEI:SA-CMM ) |
|
| |
|
|
| |
System Effectiveness
|
|
| |
A measure of the ability of a system to satisfy its intended operational uses when called upon to do so. System effectiv...
|
|
| |
Source: ( SEI:SA-CMM ) |
|
| |
|
|
| |
System Engineering Group
|
|
| |
The collection of individuals (both managers and technical staff) who have responsibility for specifying the system requ...
|
|
| |
Source: ( SEI:SW-CMM ) |
|
| |
|
|
| |
System Integration
|
|
| |
The progressive assembling of system components into the whole system....
|
|
| |
Source: ( ISO/IEC JTC1/SC1:2382-20 ) |
|
| |
|
|
| |
Systems Engineering
|
|
| |
The selective application of scientific and engineering efforts to: transform an operational need into a description of ...
|
|
| |
Source: ( SEI:SA-CMM ) |
|
| |
|
|
| |
Systems Engineering Process
|
|
| |
A comprehensive, iterative problem solving process that is used to: (a) transform validated customer needs and requireme...
|
|
| |
Source: ( SEI:SE-CMM ) |
|
| |
|
|