Software Metrics Glossary - T


  Tailor  
  To adapt a process or a set of standards or procedures to better match process or product requirements. [CMM for Softwar...  
 

Source: ( SEI:SE-CMM )

 
     
  Target Completion Date (TC)  
  An imposed date which constrains or otherwise modifies the network analysis....  
 

Source: ( PMI:PMBOK )

 
     
  Target Finish Date (TF)  
  The date work is planned (targeted) to finish on an activity....  
 

Source: ( PMI:PMBOK )

 
     
  Target Start Date (TS)  
  The date work is planned (targeted) to start on an activity....  
 

Source: ( PMI:PMBOK )

 
     
  Task  
  Well-defined unit of work in the process that provides management with visible checkpoints into the status of the projec...  
 

Source: ( SEI:SE-CMM )

 
     
  Team Count  
  A team function point count involves more than one counter, simultaneously counting the same application/project. Such c...  
 

Source: ( Total Metrics - Function Point Consultants )

 
     
  Team Development  
  Developing individual and group skills to enhance project....  
 

Source: ( PMI:PMBOK )

 
     
  Technical Parameters  
  A selected subset of the system's technical metrics tracked in TPM. Critical technical parameters are identified from ri...  
 

Source: ( SEI:SE-CMM )

 
     
  Technical Requirements  
  Those requirements that describe what the product must do. Examples of technical requirements include functions, perform...  
 

Source: ( SEI:SE-CMM )

 
     
  Technical Reviews  
  A series of systems engineering activities by which the technical progress of a program is assessed relative to its tech...  
 

Source: ( SEI:SE-CMM )

 
     
  Test  
  An activity in which a system or component is executed under specified conditions, the results are observed or recorded,...  
 

Source: ( SEI:SE-CMM )

 
     
  Test Plan  
  A plan describing the schedule, resources, and approach to verify the compliance of a system or its elements with the re...  
 

Source: ( SEI:SE-CMM )

 
     
  Time Recording Methods  
  The following methods of collecting WORK EFFORT are believed to be the most common. Method-A: Staff Hours (Recorded)The ...  
 

Source: ( ISBSG-Release 6 1999 )

 
     
  Time-Scaled Network Diagram  
  Any project network diagram drawn in such a way that the positioning and length of the activity represents its duration....  
 

Source: ( PMI:PMBOK )

 
     
  Total degree of influence (TDI)  
  The sum of the degrees of influence for the fourteen GSCs...  
 

Source: ( CPM 4.1 )

 
     
  Total Quality Management (TQM)  
  A common approach to implementing a quality improvement program within an organization....  
 

Source: ( PMI:PMBOK )

 
     
  Traceability  
  The degree to which a relationship can be established between two or more products of the development process, especiall...  
 

Source: ( SEI:SA-CMM )

 
     
  Traceability Matrix  
  A matrix that records the relationship between two or more products of the development process; for example, a matrix th...  
 

Source: ( SEI:SA-CMM )

 
     
  Transaction rate GSC  
  One of the 14 general system characteristics describing the degree to which the rate of business transactions influenced...  
 

Source: ( IFPUG CPM 4.1 )

 
     
  Transactional Functions  
  The functionality provided to the user to process data by an application. Transactional functions are defined as externa...  
 

Source: ( IFPUG CPM 4.1 )

 
     
  Transactions  
  These correspond to ‘elementary processes’ in IFPUG terminology. They are the lowest level on a functional hierarchy and...  
 

Source: ( Total Metrics - Function Point Consultants )

 
     
  Triggering event (-type)  
  A triggering event occurs outside the boundary of the measured software and initiates one or more functional processes. ...  
 

Source: ( COSMIC-FFP MM Version 2.1 )

 
     

 

 